Boiler Equipment-manufacture,factory,supplier from China

(Total 24 Products for Boiler Equipment)
Composition structure    Welding robot mainly includes robot and welding equipment. The robot is composed of the robot body and the control cabinet (hardware and software).        Welding equipment, such as arc welding and spot welding, is composed of welding power supply (including its control system), wire feeder (arc welding), welding gun (clamp), etc.
  Contact Now
Basic InstructionYu Biying, member of the project team of Beijing University of technology and deputy director of the energy and environmental policy research center of Beijing University of technology, introduced to the media, "We have installed intelligent monitoring equipment at dozens of points such as the grandstand area of the venue, energy consuming equipment and audience entrance to collect human-machine and physical environment data such as carbon dioxide concentration, flow of people, electricity, temperature and humidity of the venue in real time.
  Contact Now
IntroduceFlue gasoline desulfurization and denitration era is a boiler flue gas purification technology implemented to the chemical enterprise of multi nitrogen oxide and sulfur oxide era. nitrogen oxides and sulfur oxides are one of the predominant resources of air pollution. therefore, the utility of this era has many benefits for ambient air purification.
  Contact Now
InstructionFlue gas desulfurization and denitration generation is a boiler flue gasoline purification technology completed to the chemical industry of multi nitrogen oxide and sulfur oxide technology. nitrogen oxides and sulfur oxides are one of the foremost property of air pollutants. therefore, the software of this era has many benefits for ambient air purification.
  Contact Now
InstructionFlue gasoline desulfurization and denitration technology is a boiler flue fuel purification technology carried out to the chemical industry of multi nitrogen oxide and sulfur oxide generation. nitrogen oxides and sulfur oxides are one of the principal assets of air pollutants. consequently, the application of this era has many advantages for ambient air purification.
  Contact Now
IntroduceFlue gas desulfurization and denitration technology is a boiler flue gas purification technology applied to the chemical industry of multi nitrogen oxide and sulfur oxide generation. Nitrogen oxides and sulfur oxides are one of the main sources of air pollution. Therefore, the application of this technology has many benefits for ambient air purification.
  Contact Now
InstructionFlue gas desulfurization and denitration technology is a boiler flue gas purification technology applied to the chemical industry of multi nitrogen oxide and sulfur oxide generation. Nitrogen oxides and sulfur oxides are one of the main sources of air pollution. Therefore, the application of this technology has many benefits for ambient air purification.
  Contact Now
InstructionCentral heating, iron and steel enterprises and thermal power plants in urban winter are large-scale coal-fired production, which has become the source of air pollution. In recent years, all localities have adopted active environmental protection policies.
  Contact Now
InstructionImportant heating, iron and metal businesses and thermal strength flowers in town iciness are huge-scale coal-fired manufacturing, which has grow to be the supply of air pollutants. in state-of-the-art years, all localities have adopted energetic environmental protection pointers.
  Contact Now
InstructionCentral heating, iron and metal organizations and thermal electricity flowers in urban wintry weather are large-scale coal-fired production, which has grow to be the supply of air pollution. in recent years, all localities have followed active environmental safety policies.
  Contact Now
InstructionImportant heating, iron and metal companies and thermal power plants in city iciness are large-scale coal-fired production, which has grow to be the supply of air pollutants. in latest years, all localities have adopted active environmental protection guidelines.
  Contact Now
Stainless steel heat exchanger is a kind of heat exchanger made of stainless steel. It has very good oxidation resistance, safety and health, and is widely used in food, medicine, heating, domestic water, air conditioning return water and other fields. According to the data of the heat exchange equipment promotion center, the stainless steel heat exchanger has better heat transfer effect and longer service life than the traditional carbon steel heat exchanger.Stainless steel heat exchanger has been widely used in many fields at present.
  Contact Now
InstructionPrimary heating, iron and metallic groups and thermal strength plant life in city wintry weather are large-scale coal-fired manufacturing, which has come to be the supply of air pollutants. in latest years, all localities have followed lively environmental protection guidelines.
  Contact Now
Basic InstructionDart is a public transportation system based totally on public transportation. it connects the suburb of dar es salaam with the important agency district. the middle started out out operation in may 2016. the primary phase of manufacturing became finished in december 2015, with a complete price of 159.6 million euros, funded thru the african improvement financial institution, the arena monetary organization and the tanzanian authorities.
  Contact Now
Basic InstructionRonald lwakatare, chief govt of tanzania's speedy transit authority, stated they'd received $148.1 million for section iii and $99.9 million for section iv. "the funds obtained will make contributions to the actual production of brt infrastructure, and the government might be answerable for compensating people who will be tormented by the project," he stated.Under Construction
  Contact Now
Basic InstructionDart is a public transportation gadget primarily based on public transportation. it connects the suburb of dar es salaam with the critical enterprise district. the center started out operation in may 2016. the primary section of production turned into completed in december 2015, with a complete price of 159.6 million euros, funded via the african improvement bank, the arena financial institution and the tanzanian authorities.
  Contact Now
Basic InstructionAccording to the relevant person in charge of the South extension project of Shunhe expressway, the South extension of Shunhe expressway will realize multi-level and full coverage of BRT + rail transit + ordinary bus + tourist bus, maximize the high-quality road resources, tilt to slow and public transport, make public transport travel more convenient, give priority to public transport signals, implement green wave traffic, intelligent monitoring of the whole line, and use information technology to improve traffic management level and travel service level.
  Contact Now
Basic InstructionThis project reflects that our company has a mature industrial chain in undertaking international projects, including design, production and installation, and conforms to local standards. It also indicates that our business is steadily moving forward to the world!
  Contact Now
Basic InstructionThe bridge has a total length of 111 meters and a span of 5 meters,Forty-four meters of it were blown up during the fighting.
  Contact Now
Basic InstructionThe bridge has a total period of 111 meters and a span of 5 meters,40-4 meters of it were blown up at some point of the preventing.
  Contact Now
Basic InstructionRonald lwakatare, leader executive of tanzania's fast transit authority, said that they had acquired $148.1 million for phase iii and $99.9 million for phase iv. "the price range acquired will make contributions to the real construction of brt infrastructure, and the authorities might be accountable for compensating folks that will be tormented by the assignment," he said.the bridge has a total period of 111 meters and a span of five meters,40-4 meters of it were blown up for the duration of the preventing.
  Contact Now
Basic InstructionRonald lwakatare, leader executive of tanzania's fast transit authority, said that they had acquired $148.1 million for phase iii and $99.9 million for phase iv. "the price range acquired will make contributions to the real construction of brt infrastructure, and the authorities might be accountable for compensating folks that will be tormented by the assignment," he said.the bridge has a total period of 111 meters and a span of five meters,40-4 meters of it were blown up for the duration of the preventing.
  Contact Now
Basic InstructionRonald lwakatare, leader government of tanzania's rapid transit authority, said that they had obtained $148.1 million for segment iii and $99.9 million for segment iv. "the finances acquired will contribute to the actual construction of brt infrastructure, and the government might be chargeable for compensating individuals who could be affected by the challenge," he stated.
  Contact Now
Relate News
Recently, Guoshun Group won the top 100 private enterprises in Jinan, and the top ten high-end equipment and intelligent manufacturing industries! Zhang Lianbo, member of the party group of Jinan Private Economic Development Bureau, and Meng Haibo, member of the party group of the Municipal Federation of Industry and Commerce, attended the awarding ceremony of Changqing District. Sun Deshan, chairman of Guoshun Group, was invited to attend and speak.Guoshun Group has always insisted on leading the development of the industry driven by technological innovation.
The Dubai Expo 2020 has come to a glorious end. As the "finale" of the series of provincial activities of The China Pavilion, the opening ceremony of Shandong Week attracted political and business representatives from many countries, regions and international organizations from all over the world to participate in the event online and offline.
Expanded creation scheduleFabricated off-website online with geometrically controlled system, structural metal has the benefit of being prepared to erect as soon as it reaches the bridge site. reinforcement and formwork set up is not required. structural metal erection isn't limited to a specific temperature range. structural metal is frequently lighter than different materials for the identical span, ensuing in smaller or fewer erection cranes.
Recently, the 2022 cost management conference of the group company with the theme of "forcing cost reduction to achieve lean, high-quality and high-speed sustainable development" was held in the publicity and education center on the 8th floor of the headquarters.
       The stadium project is located in the west district of the starting area for the transformation of old and new kinetic energy in Jinan city, Shandong Province, with a total construction area of 9,824 square meters, including 7,124.84 square meters above ground and 2,698.15 square meters underground. The building height is 20.60 meters, the height is 4.5 meters, and the local height is 11 meters.     Guoshun is the general contractor for the construction of this project.
Recently, the 2022 business conference of the group with the theme of "upholding the integrity and expanding the new, striving for the future" was held in the publicity and education center on the 8th floor of the headquarters. The whole group gathered together to discuss new ideas for the development of the company's long-term operation, innovative operation and future operation under the new industry ecology.
Recently, the Third Forum on the Coordinated Development of the Belt and Road Initiative and the Building of a Manufacturing Powerhouse and the 2022 China Industrial Carbon Summit Forum were held in Hainan Province. At the meeting, the list of "the first Chinese industrial carbon peak 'leader' enterprises" was released, and a total of 42 outstanding enterprises were selected.
    Recently, the "industrial flue gas multi pollutant ultra low emission Engineering Research Center" led by Guoshun group was recognized as the engineering research center of Shandong Province.
    In November, the group signed the first phase of the BRT station project in dar es Salaam, Tanzania, which will become another bright spot in the international trade of the Group after its completion.    The group will take this as an opportunity to strengthen foreign exchanges and cooperation, actively docking the international trade market, fully open the domestic and foreign "double good" situation, for the realization of the group "double hundred goals" to create a new trend!
Browns Plains Bus StationPROJECT SCOPEThis project located in Australia Browns Plains and adjoining the Grand Plaza shopping aimed to:Provide more passenger waiting space.Provide new fully sheltered platforms with comfortable seating, security cameras and lighting.Improve pedestrian and cyclist connectivity between the bus station, the shopping centre and Browns Plains Road.Improve accessibility for all customers and ensure compliance with disability access standards.Introduce a designated kiss 'n' ride area to drop-off and pick-up passengers.Introduce bicycle storage facilities.A part