Completed Heat Plate Exchanger-manufacture,factory,supplier from China

(Total 24 Products for Completed Heat Plate Exchanger)
IntroducePlate heat exchanger has the characteristics of high heat exchange efficiency, small heat loss, compact and lightweight structure, small floor area, wide application and long service life.
  Contact Now
IntroducePlate warmness exchanger has the characteristics of excessive warmness trade overall performance, small heat loss, compact and mild-weight shape, small ground place, extensive software program and lengthy carrier life.
  Contact Now
IntroducePlate heat exchanger has the characteristics of excessive warm temperature alternate ordinary performance, small warmth loss, compact and light-weight shape, small ground region, massive software and extended provider life.
  Contact Now
Stainless steel heat exchanger is a kind of heat exchanger made of stainless steel. It has very good oxidation resistance, safety and health, and is widely used in food, medicine, heating, domestic water, air conditioning return water and other fields. According to the data of the heat exchange equipment promotion center, the stainless steel heat exchanger has better heat transfer effect and longer service life than the traditional carbon steel heat exchanger.Stainless steel heat exchanger has been widely used in many fields at present.
  Contact Now
IntroducePlate heat exchanger has the characteristics of excessive warmness change performance, small heat loss, compact and light-weight shape, small ground vicinity, wide software and lengthy service lifestyles.
  Contact Now
Wear resistant steel plate refers to special plate products specially used under large area wear conditions. The commonly used wear-resistant steel plate is a plate product which is made by overlaying a certain thickness of alloy wear-resistant layer with high hardness and excellent wear resistance on the surface of ordinary low carbon steel or low alloy steel with good toughness and plasticity. In addition, there are cast wear-resistant steel plates and alloy quenched wear-resistant steel plates.
  Contact Now
IntroducePlate warmness exchanger has the characteristics of excessive warmth change overall performance, small warmth loss, compact and light-weight form, small floor vicinity, huge software and prolonged service lifestyles.
  Contact Now
InstructionFlue gas desulfurization and denitration generation is a boiler flue gasoline purification technology completed to the chemical industry of multi nitrogen oxide and sulfur oxide technology. nitrogen oxides and sulfur oxides are one of the foremost property of air pollutants. therefore, the software of this era has many benefits for ambient air purification.
  Contact Now
Basic InstructionThe bridge has a total duration of 111 meters and a span of 5 meters,40-4 meters of it have been blown up for the duration of the combating.
  Contact Now
Basic InstructionYu Biying, member of the project team of Beijing University of technology and deputy director of the energy and environmental policy research center of Beijing University of technology, introduced to the media, "We have installed intelligent monitoring equipment at dozens of points such as the grandstand area of the venue, energy consuming equipment and audience entrance to collect human-machine and physical environment data such as carbon dioxide concentration, flow of people, electricity, temperature and humidity of the venue in real time.
  Contact Now
Basic InstructionThe whole process supervision and inspection of the project was completed by the international well-known bureau veritas. The design, production and full assembly services of Guoshun group were evaluated as "very satisfied" by the owner icafal Ingenier í a Y constructi ó n S.A. (the sixth largest general contractor in Chile and rated as the national champion of Chilean construction sustainable development company by the Chilean house of Representatives).Site Display
  Contact Now
Basic InstructionRonald lwakatare, chief govt of tanzania's speedy transit authority, stated they'd received $148.1 million for section iii and $99.9 million for section iv. "the funds obtained will make contributions to the actual production of brt infrastructure, and the government might be answerable for compensating people who will be tormented by the project," he stated.Under Construction
  Contact Now
Basic InstructionDart is a public transportation gadget primarily based on public transportation. it connects the suburb of dar es salaam with the critical enterprise district. the center started out operation in may 2016. the primary section of production turned into completed in december 2015, with a complete price of 159.6 million euros, funded via the african improvement bank, the arena financial institution and the tanzanian authorities.
  Contact Now
Basic InstructionThe complete process supervision and inspection of the assignment changed into completed with the aid of the international well-known bureau veritas. the layout, production and full assembly offerings of guoshun organization had been evaluated as "very glad" by using the owner icafal ingenier í a y constructi ó n s.a. (the 6th largest standard contractor in chile and rated because the countrywide champion of chilean creation sustainable development business enterprise through the chilean residence of representatives).Site Display
  Contact Now
Basic InstructionDart is a public transportation system based on public transportation. It connects the suburb of Dar es Salaam with the central business district. The center began operation in May 2016. The first phase of construction was completed in December 2015, with a total cost of 159.6 million euros, funded by the African Development Bank, the world bank and the Tanzanian government. The first phase of the BRT system, with a total length of 21 km, extends from kimara via ubungo to kivukoni, Morocco and gerezani.
  Contact Now
Basic InstructionThe metal shape fabrication is complying with CE-Exc3 certification and we will offer you the welding metal shape with govt standard: Welds AS/NZ1554.1/AS1554.5;AWS D1.1/D1.3/D1.5/D1.6; EN1090-2.Steel construction projectTanzania steel bridgeSteel projects in China
  Contact Now
Composite wear-resistant plate has the characteristics of high wear resistance, impact resistance and easy processing. It can be connected with other structural parts by welding, plug welding and bolt connection. It is widely used in ports, docks, metallurgy, cement, coal, power, mines, steel, building materials, bricks and other industries.
  Contact Now
Falling film evaporation is to add the feed liquid from the upper tube box of the heating chamber of the falling film evaporator, evenly distribute it to each heat exchange tube through the liquid distribution and film-forming device, and form a uniform film to flow from top to bottom under the action of gravity, vacuum induction and air flow. During the flow process, it is heated and vaporized by the shell side heating medium. The generated steam and liquid phase enter the separation chamber of the evaporator together.
  Contact Now
IntroduceMetallic structure platform is a structural platform composed of metal material, which is one of the primary types of building structure of the platform.the shape is especially composed of steel beam, metal column, metallic truss and different additives fabricated from type steel and metal plate, and adopts silanization, pure manganese phosphorization, washing and drying, galvanizing and different rust elimination and rust prevention generation.welds, bolts or rivets are commonly used between the individuals or additives.because of its mild weight and simple construction, it's mil
  Contact Now
Basic InstructionDart is a public transportation system based on public transportation. It connects the suburb of Dar es Salaam with the central business district. The center began operation in May 2016. The first phase of construction was completed in December 2015, with a total cost of 159.6 million euros, funded by the African Development Bank, the world bank and the Tanzanian government. The first phase of the BRT system, with a total length of 21 km, extends from kimara via ubungo to kivukoni, Morocco and gerezani.          Construction Process
  Contact Now
IntroduceSteel structure platform is a structural platform composed of steel material, which is one of the main types of building structure of the platform.The structure is mainly composed of steel beam, steel column, steel truss and other components made of type steel and steel plate, and adopts silanization, pure manganese phosphorization, washing and drying, galvanizing and other rust removal and rust prevention technology.Welds, bolts or rivets are usually used between the members or components.Because of its light weight and simple construction, it is widely used in platform engineering p
  Contact Now
Basic InstructionThe steel structure fabrication is complying with CE-Exc3 certification and we can provide you the welding steel structure with executive standard: Welds AS/NZ1554.1/AS1554.5;AWS D1.1/D1.3/D1.5/D1.6; EN1090-2.Steel construction projectAustralia steel bridgeSteel projects in China
  Contact Now
IntroduceMetallic shape platform is a structural platform composed of metal cloth, that's one of the number one forms of building structure of the platform.the form is especially composed of steel beam, metallic column, metallic truss and one-of-a-kind additives made from type steel and metal plate, and adopts silanization, natural manganese phosphorization, washing and drying, galvanizing and one-of-a-kind rust removal and rust prevention era.welds, bolts or rivets are typically used among the people or additives.due to its mild weight and easy creation, it's miles widely used in plat
  Contact Now
Basic InstructionDart is a public transportation system based totally on public transportation. it connects the suburb of dar es salaam with the important agency district. the middle started out out operation in may 2016. the primary phase of manufacturing became finished in december 2015, with a complete price of 159.6 million euros, funded thru the african improvement financial institution, the arena monetary organization and the tanzanian authorities.
  Contact Now
Relate News
These days there are warmness exchangers made of different substances. the choice of the suitable cloth is decisive for the function and carrier lifestyles. because of this, unique attention must be paid to it from the begin. viesel has been constructing heat exchangers only out of stainless-steel for over 50 years.excessive needs are made at the fabric in heat exchanger creation. warmth stresses because of the massive temperature differences can create cracks inside the fabric.
  Recently, two rod-arch Bridges in the first phase of the municipal project in Cuizhai South Area of Jinan starting Area have completed the main construction after overall careful planning and careful deployment, laying a foundation for the full opening of municipal roads in this area.   According to the introduction, the first phase of the municipal project in the south area of Cuizhai contains 9 roads, with a total length of 12.457 kilometers, including Cuiqing Road, Cuiqing Branch Road, Trunk Road 1, Jieying Road, North Boundary Road, Hengshi Road, City Exhibition Hall Ring
Recently, the main construction of kiwar Road Pedestrian Overpass of bid section 1 of Tanzanian BRT phase II project was completed.In order to ensure the smooth construction of the overpass, the project department developed a detailed construction scheme before construction, and conducted pre job training for all construction personnel to strictly control the quality.
The Group's International Trade Department has been deeply involved in overseas markets for many years, and has a complete manufacturing technology system and high-quality overseas resources. Under the severe situation of the globalization of the epidemic, the International Trade Department continues to move forward and continue to develop! This year, it has completed many international projects such as the second phase of Tanzania BRT station, the third phase of Tanzania BRT station, French GEA sodium bromide, and Chilean seawater desalination.
A few days ago, the steel beam hoisting construction of Bandri railway overpass bridge was completed for the bid section 1 project of phase II BRT project in Tashi, Tanzania.The upper part of the overpass is composed of steel structure I-beams and reinforced concrete bridge deck, which are spliced by 126 I-steel beams, with a total length of 80m.
      The reconstruction project of national fitness center in Changqing district undertaken by Guoshun Group was selected as gold medal project of Steel structure in Shandong Province by Shandong Steel Structure Industry Association.       The National Fitness Center project in Changqing District is a key project in Changqing District. With a total investment of 140 million yuan, the project covers an area of 38197.1 square meters and a total construction area of 26188.85 square meters, including 21772.21 square meters of newly built construction area.
Sheikh Abdullah Al Salem Cultural Centre (ASCC) is a new world-class museum district within Kuwait City. Together with the Sheikh Jaber Al Ahmad Cultural Centre (JACC), and recently restored Al Salam Palace, also SSH projects, it will form Kuwait’s new national cultural district,GuoShun Group supply the Main steel structure,SSH as general contractor.The museums are a celebration of Kuwaiti, Islamic and Arab culture and history.
Economic systemThe metal shape building makes use of superior design and processing generation and large-scale production methods so that the fee may be considerably reduced. simultaneously, the simple and speedy installation saves many production charges and permits corporations or builders to put it into production extra quick.Conventional bolstered concrete homes have a excessive value of civil production and long production intervals.
In order to enhance the front-line employees' in-depth understanding of the group company, improve the cohesion of employees, and enhance the sense of belonging of Guoshun people, from June 20 to June 22, the operation management head office held a training + group construction activity with the theme of "gratitude meets, cohesion Guoshun".
Recently, the Third Forum on the Coordinated Development of the Belt and Road Initiative and the Building of a Manufacturing Powerhouse and the 2022 China Industrial Carbon Summit Forum were held in Hainan Province. At the meeting, the list of "the first Chinese industrial carbon peak 'leader' enterprises" was released, and a total of 42 outstanding enterprises were selected.